Bennington Peanut Roundabout
Project Statistics
Client: Vermont Agency of Transportation
Location: Bennington, Vermont
Date Completed: September, 2026
Contract Value: $6.45 million
Highlights
- Vermont’s first peanut-style roundabout
- More than 1,000 feet of drainage pipe installed
- More than 5,000 cubic yards of dense-grade gravel placed
- More than 3,000 feet of granite curb installed
- Approximately 2,000 tons of asphalt placed
- 14 new lights installed
- New concrete islands, sidewalks and pedestrian crossings
- Temporary bypass road constructed to maintain traffic through the project
About the Project
Casella Construction served as the general contractor for Vermont’s first peanut-style roundabout, located at the intersection of VT Route 67A, Silk Road, Matteson Road and College Drive near Bennington College.
The project rebuilt the intersection from the ground up with new drainage, utilities, roadway, granite curbing, concrete islands, sidewalks, lighting and pavement. The new configuration was designed to slow vehicles, simplify traffic flow and improve safety and access for drivers, pedestrians and bicyclists at what had historically been a confusing, high-crash intersection.
To keep traffic moving while providing crews with a safer and more efficient work area, Casella Construction built a temporary bypass road around the primary construction zone. The approach replaced the original seven-phase traffic plan and allowed much of the roundabout to be constructed without routing vehicles directly through the active work area.